COMcheck vs. Title 24
When COMcheck is accepted, when you need Title 24, and how to document energy-code compliance so the package holds up under plan review.
- Step one on any project: confirm the adopted code and edition for that jurisdiction.
- A COMcheck that's internally valid but disagrees with the set can trigger a plan-review comment.
- If your project is in California, put COMcheck away; California doesn't use it.
COMcheck is the free DOE tool accepted in most U.S. states to demonstrate commercial energy-code compliance — but California does not accept it. California runs its own code, Title 24 Part 6, documented on NRCC forms for nonresidential and high-rise multifamily work. Several other states and cities also require their own forms. The first step on any project is always the same: confirm the jurisdiction, the adopted code edition, and the accepted compliance format before you pick a path.
The Two Things You’re Complying With
There's a whole category of plan-check comments that has nothing to do with whether your systems are designed well. The equipment can be right-sized, the ductwork clean, the panel schedules tight — and the set still bounces, because the energy-code compliance document is missing, wrong for the jurisdiction, or doesn't match the drawings.
Before the paperwork, the standard. Outside California, commercial energy-code compliance in the U.S. traces back to one of two documents:
- The IECC (International Energy Conservation Code), published by the ICC, adopted by most states.
- ASHRAE Standard 90.1, published by ASHRAE, which most jurisdictions accept as an alternative compliance path to the IECC.
The catch: jurisdictions adopt a specific edition — one edition today, a newer one next cycle — and they adopt on their own timelines. The energy code in force for your project depends on where and when you're permitting, not on the newest book on the shelf. Step one on any project is always the same: confirm the adopted code and edition for that jurisdiction.
Prescriptive vs. Performance (and the Trade-Off Path)
Every energy code offers more than one road to "compliant," and choosing the road is real engineering:
- Prescriptive path. Meet a checklist of minimum requirements component by component — insulation values, window U-factors/SHGC, lighting power density, equipment efficiencies. Simple and fast, but rigid: every element has to meet its own minimum, with no credit for over-performing elsewhere.
- Trade-off path. A middle route that lets one component's shortfall be offset by another's over-performance within a category (common on the envelope) — more flexibility without a full model.
- Performance path. Model the whole building's energy use and show it meets a code-defined performance target, with the mandatory requirements still met. The most flexible — it rewards good design holistically and enables aggressive glazing or unusual systems — but it takes an energy model and more documentation.
The right path depends on the project: prescriptive when the design is conventional and you want speed; performance when the architecture pushes past prescriptive limits and you need the trade-offs. Picking the wrong path is a common source of avoidable rework.
COMcheck: The Common Path Outside California
COMcheck is a free software tool from the U.S. Department of Energy. It's a widely used way to demonstrate commercial energy-code compliance across most of the country, and it covers the three areas a reviewer cares about:
- Building envelope — insulation, fenestration, U-factors.
- Interior and exterior lighting — lighting power density against the allowance.
- Mechanical — equipment efficiencies and controls.
COMcheck generates a compliance report that the responsible party signs and you submit with the permit set. It supports more than one path to "compliant" — a straightforward prescriptive approach, and trade-off approaches that let a better-performing component offset a weaker one within the same system, most often the envelope. That flexibility is useful, but it's also where drawings and the report drift apart: if you run a trade-off in COMcheck, the drawings have to reflect the same assumptions.
One clarification that saves confusion: COMcheck is for commercial buildings and residential buildings more than three stories above grade — which includes four- and five-story wrap and podium apartments. REScheck handles low-rise residential: one- and two-family dwellings, townhouses, and R-2/R-3/R-4 buildings three stories or fewer. Reaching for the wrong one is a fast way to a comment.
Inside COMcheck: Envelope, Lighting, Mechanical
A COMcheck submission is really three compliance checks bundled together, and each is often searched on its own:
- Envelope. Insulation, fenestration U-factor and SHGC, and the assemblies — checked against the adopted code for the project's climate zone.
- Lighting. Interior (and sometimes exterior) lighting power density (LPD) — total watts against an allowance — plus required controls (occupancy sensors, daylighting, time controls). This is the piece our electrical design team owns.
- Mechanical. HVAC and service-water equipment efficiencies, economizers, and control requirements — coordinated with HVAC / mechanical design.
The critical thing — and the whole point of this article — is that all three have to agree with the drawings. The COMcheck lighting page has to match the lighting schedule; the mechanical page has to match the equipment schedule; the envelope inputs have to match the architectural assemblies. A COMcheck that's internally valid but disagrees with the set can trigger a plan-review comment.
Getting the climate zone wrong is its own common miss — it drives insulation and glazing minimums across the whole envelope check, not just one line item, so it's worth confirming before any of the other inputs get run.
COMcheck’s Two Codes: IECC vs. ASHRAE 90.1
COMcheck can demonstrate compliance with either the IECC (International Energy Conservation Code) or ASHRAE 90.1 — and many jurisdictions accept 90.1 as an alternative compliance path to the IECC. They're closely related but not identical: they differ in some prescriptive requirements, how certain trade-offs work, and the exact efficiency and LPD numbers. The adopted code (and which edition) is set by the jurisdiction, and on some projects choosing 90.1 vs. the IECC path within COMcheck can make a marginal design comply that wouldn't under the other. The practical move is to confirm, up front, which code and edition the AHJ has adopted — because designing to the wrong one is invisible until plan check rejects it.
ASHRAE 90.1 isn't the only ASHRAE standard on the set, either — ventilation rates are governed separately, by ASHRAE 62.1 or the mechanical code the jurisdiction adopts (in California, Title 24 Part 6 Sections 120.1 and 160.2), and the two get confirmed together at the same kickoff conversation. If the performance path is in play, the cooling-load methods behind the energy model matter too.
Title 24: California Is Its Own World
If your project is in California, put COMcheck away. California doesn't use it. The state runs its own energy code — Title 24, Part 6, the Building Energy Efficiency Standards, administered by the California Energy Commission (CEC).
Title 24 compliance follows either a prescriptive or a performance path, and the performance path typically runs through state-approved software (CBECC) rather than COMcheck. Nonresidential and high-rise multifamily compliance is documented on NRCC forms (Nonresidential Certificates of Compliance) that get incorporated into the set; low-rise multifamily uses LMCC forms and single-family homes use CF1R. Submit a COMcheck report to a California jurisdiction and you haven't demonstrated compliance at all.
One more Title 24 note: California updates the standards on a roughly three-year cycle, and each update changes the requirements. Always confirm which edition is in force for your permit date.
The Other Exceptions You Have to Know
California is the big one, but it isn't the only state that goes its own way. Several states adopt the IECC or 90.1 but require their own forms or amended versions. Practically, that means for jurisdictions like Washington, Oregon, Florida, and New York City, you should confirm the required format — not just assume a national COMcheck will be accepted.
The takeaway isn't "memorize fifty states." It's "never assume." The energy-compliance format is a jurisdiction question you answer at project kickoff, every time.
For firms running a multi-state pipeline, this becomes an every-project checklist item rather than a one-time lookup — the jurisdiction, code edition, and accepted format get re-confirmed for each site, even within the same portfolio, because two projects five miles apart can sit in different jurisdictions with different requirements.
Which Path Applies Where — and the Workflow
The document you prepare is decided before any modeling starts, by the jurisdiction's adopted code:
| Jurisdiction type | Typical compliance |
|---|---|
| California | Title 24, Part 6 (NRCC forms / CBECC; LMCC or CF1R for low-rise residential) |
| Most IECC-adopting states (e.g., much of the U.S.) | COMcheck (IECC) |
| ASHRAE 90.1 accepted | COMcheck (90.1 path) |
| States with their own amended forms (e.g., some Northwest/Northeast states) | State-specific forms/software |
(Confirm the specific jurisdiction and adopted edition — states amend and update on their own schedules.)
The workflow, either way: confirm jurisdiction → identify the adopted code and edition → choose the compliance path (prescriptive / envelope trade-off / whole-building performance) → run the tool that matches it: COMcheck for prescriptive and envelope trade-off documentation, CBECC or another CEC-approved tool for Title 24, or an approved whole-building simulation for the IECC C407 or ASHRAE 90.1 performance path (Appendix G or the Energy Cost Budget method) → reconcile the report against the drawings → submit for permit → satisfy plan review → verify at inspection. The same sequencing applies whether it's a restaurant build-out or a multifamily project — only the systems being checked change. COMcheck documents prescriptive and trade-off compliance; it is not a whole-building energy model.
The energy-compliance comments that bounce sets: the COMcheck (or NRCC) built to the wrong code edition; the wrong climate zone; a lighting schedule that doesn't match the compliance lighting page; HVAC efficiencies that don't match the equipment schedule; and envelope assumptions that don't match the architectural drawings. Every one is a coordination failure between the compliance document and the set — which is exactly why the compliance report can't be an afterthought produced in isolation, and why we treat it as part of MEP coordination rather than a separate task. It's also just one entry on a longer list — see our broader look at common MEP plan-check comments for the patterns that show up beyond energy code.
A Five-Question Decision Flow
When a new project lands, run it through this before you pick a compliance path:
- What jurisdiction and what adopted code edition? Confirm it; don't assume the newest.
- Is it California? If yes → Title 24 (NRCC forms for nonresidential and high-rise multifamily work), full stop.
- Does the state or city require its own form or amended code? WA, OR, FL, NYC and others — check.
- Commercial or low-rise residential? COMcheck vs REScheck.
- Prescriptive or trade-off/performance? Pick the path, then make sure the drawings match the assumptions you used.
Documentation That Survives Review
Once the code, edition, climate zone and format are right, a reviewer approving your energy package checks that the compliance document passes, agrees with the drawings, and covers the applicable mandatory requirements.
- Match every value. Fixture wattages on the compliance form match the lighting schedule. Equipment efficiencies match the mechanical schedule.
- Use the right form for the jurisdiction, at the correct code edition.
- Put the signed report in the set, not in a separate email nobody can find at review.
- If you ran a trade-off, say so and make sure the drawings carry the same assumptions.
- Confirm who owns it. On some teams it's unclear whether the MEP engineer or the architect is confirming the code edition and compiling the report — that's a scope question worth settling at kickoff, not at submittal.
We treat the energy-compliance package as part of the design, not a box we check at the end. The jurisdiction and code edition get confirmed at kickoff — during the same early MEP design phases (SD/DD/CD) conversation where the rest of the scope gets set — the right compliance path gets chosen before we're deep into the drawings, and the compliance document is cross-checked against every schedule before the set goes out.
One miss we look for: a set designed to the wrong energy-code edition because the team assumed the newest one applied. Confirmed at kickoff, it's a non-issue; discovered at plan check, it's a resubmittal.
See how we work, or schedule a scope call.
Related: Cooling-Load Methods (Heat Balance / RTS / CLTD) · ASHRAE 62.1 Ventilation · MEP Coordination Best Practices
Common Questions
No. California uses its own energy code, Title 24 Part 6, documented on NRCC compliance forms for nonresidential and high-rise multifamily work — a COMcheck report submitted to a California jurisdiction does not demonstrate compliance at all.
COMcheck is for commercial buildings and residential buildings more than three stories above grade — which includes four- and five-story wrap and podium apartments. REScheck, its sibling tool, handles low-rise residential: one- and two-family dwellings, townhouses, and R-2/R-3/R-4 buildings three stories or fewer. Using the wrong one for your building type is a fast way to a plan-check comment.
Both are valid national standards — the IECC (adopted by most states) and ASHRAE 90.1 (accepted by most jurisdictions as an alternative path). The jurisdiction adopts a specific edition — usually of the IECC, which also permits ASHRAE 90.1 as a path — so the first step on any project is confirming which standard and edition is in force where you are permitting.
The U.S. DOE's free software for demonstrating that a commercial building's envelope, lighting, and mechanical systems comply with the IECC or ASHRAE 90.1.
It's not universally mandated, but it's a common way to document commercial energy-code compliance in most jurisdictions that adopt the IECC — where the AHJ expects a compliance report, COMcheck is often the vehicle.
Typically the design team — the MEP engineer for the mechanical and lighting portions, coordinated with the architect on the envelope; CoreX prepares it as part of the design deliverable, under the direction and seal of the client's engineer of record.
California's Building Standards Code. For energy work, 'Title 24' means Part 6, the Building Energy Efficiency Standards, administered by the CEC and updated on its own cycle.
The California Building Energy Code Compliance software used for the Title 24 performance path — CEC-approved alternatives such as EnergyPro, or IES VE for nonresidential new construction only, are also accepted.
Envelope (insulation, fenestration), lighting (power density and controls), and mechanical (HVAC and service-water efficiency and controls), plus electrical power requirements and, under the 2021 IECC, the additional-efficiency credits of Section C406.
A compliance route that models the whole building's energy use against a code baseline, allowing design trade-offs the prescriptive path doesn't — at the cost of an energy model and more documentation.
The compliance report (COMcheck report, Title 24 NRCC forms, or the performance-path energy-model report) reconciled with the drawings — the compliance pages have to match the lighting, equipment, and envelope shown in the set.
Senior electrical designer with 6+ years in U.S. MEP design, contributor to 900+ projects, and an experienced third-party peer and plan reviewer.
Connect on LinkedIn →